5 Things That Happen at Michigan’s Soo Locks Before They Close for the Winter
If you’ve been meaning to watch a giant freighter pass through the Soo Locks, don’t wait, because the season is winding down.
What you’ll see in January isn’t what you’d see now.
Here’s what happens at Michigan’s Soo Locks before they close for the winter.
1. Visitor Center Closing
The Soo Locks Visitor Center closed for the season at the end of October, more than two months before the locks themselves will shut.
Last year, it closed at 7 p.m. on Oct. 31 after more than 210,000 visitors, and it stayed shut until May 1.
If you want a look inside, you’ll need to wait until next year.
2. MacArthur Lock Shutting First
The MacArthur Lock closes for the season when weather or ice makes it unsafe or inefficient to run, or when the Poe Lock closes, whichever comes first.
The U.S. Army Corps of Engineers, which runs the locks, gives the shipping industry at least 48 hours of notice before the MacArthur Lock closes for the season.
That means you won’t find a set date for it because the date depends on the weather.
In the 2024-25 season, the MacArthur Lock closed on Dec. 16, and the Poe Lock was set to stay open until Jan. 15, 2025.
If you’re counting down to the closing, watch the MacArthur Lock first because it can close well ahead of the Poe Lock.
Psst! How much do you know about Great Lakes shipping? Take our quiz and see if you can ace it.
Quiz
Soo Locks and Straits IQ
Answer these questions on the Soo Locks, icebreakers, and the Mackinac Bridge. We bet you can’t get them all right. Prove us wrong?
How long is the Mackinac Bridge, counting its full length?
3. Coast Guard Icebreakers
Coast Guard icebreakers work the river around the Soo Locks once newly formed ice begins to hinder freighters.
The Coast Guard calls the effort Operation Taconite, its largest domestic icebreaking operation.
In 2025, the operation started on Jan. 6, with the cutters Katmai Bay and Neah Bay covering the St. Marys River and the Straits of Mackinac.
In 2017, the operation began in December.
The 2017 measures included daylight-only tanker transits in ice.
They also cut speeds by 2 mph in certain stretches and added reporting points.
4. Poe Lock Working Alone
Once the MacArthur Lock closes, the Poe Lock, the only lock large enough for 1,000-foot freighters, works alone.
It runs around the clock, since the Soo Locks run 24/7 until the winter closing begins.
The Corps says the Poe Lock stays open through Jan. 15 or until commercial traffic stops.
If your freighter reaches the lock at 3 a.m., you wait your turn, since ships pass in order of arrival.
U.S. government vessels may go first.
5. Final Ship of the Season
The Soo Locks close at 11:59 p.m. on Jan. 15, or earlier if the last commercial ship has already passed.
The federal closing rule sets the cutoff by direction: Ships heading downbound from a Lake Superior port have until Jan. 14, and upbound ships passing Detour, on Lake Huron, have until Jan. 15, both before midnight.
The rule leaves room to move those dates if a vessel is in an emergency.
Last season, the Corps says the last vessel of the season transited the Poe Lock on Jan. 15.
The last ship of the 2018-19 season was the Manitoulin, which finished locking through at 9:32 p.m. on Jan. 15.
In 2019, the final ship finished with more than two hours to spare.
Bulkheads and Divers
The Soo Locks stop moving ships the moment the last one clears, and crews turn to draining the Poe Lock.
In 2021, the Corps described the routine: Crews place bulkheads, and divers seal them in icy water so the locks can drain.
Temporary panel bridges then span the Poe and MacArthur Locks, which lets crews haul materials and equipment to job sites.
Last winter's plan drained only the Poe Lock and left the MacArthur Lock wet.
Winter is no lull because crews handle complex maintenance on aging infrastructure in a harsh northern climate.
The 2026 Repair List
Last winter's shutdown ran about 10 weeks, with a long repair list on the Poe Lock.
Crews cleaned out the underfloor area, inspected manholes, and worked on Gates 1, 2 and 4.
They also tested an experimental coating meant to shed ice.
The Corps credited the crews with finishing on schedule despite a near-record snowfall season.
The work included a five-year inspection.
The plan also called for replacing pier fender timbers at both locks and inspecting electrical and mechanical systems.
Reopening on March 25
The Soo Locks reopen on March 25, the day federal rules call for at least one lock to be in operation.
Last March, the Poe Lock opened to all marine traffic at 12:01 a.m. that day.
The January plan had the MacArthur Lock reopening in late April.
The park and viewing platform opened at 11:30 p.m. on March 24.
If you want to watch the first ship, you should be there before midnight.
If you go, everyone entering the park gets a security search, and pets and bicycles aren't allowed.
The Visitor Center followed with an open house from 9 a.m. to 3 p.m. on March 25.
13 Things Michiganders Say That Confuse Everyone From Out of State

You can grow up in Michigan, move away, and find out a word you've used your whole life needs an explanation.
By the third blank stare, you start wondering what else only makes sense back home.
13 Things Michiganders Say That Confuse Everyone From Out of State
8 Wedding Habits Michiganders Say Have Gotten Out of Hand

Weddings keep getting bigger, and the guests are footing part of the bill.
Some of those habits leave Michiganders rolling their eyes.
